The City is wrapping up a traffic study to evaluate the feasibility of closing parts of Wellington Crescent to vehicles. Property owners that are adjacent to the project area were invited to an upcoming meeting to discuss the outcomes of the traffic study. Public engagement opportunities for the community and the general public will begin on June 2. Stay up-to-date by signing up for project updates. We look forward to gathering your feedback in June.
Share October 23, 2019 on Facebook
Share October 23, 2019 on Linkedin
Email October 23, 2019 link
The City has begun a traffic study to evaluate the feasibility of closing parts of Wellington Crescent to vehicles. A partial closure was identified at the stakeholder meeting and discussed at the adjacent property owner meeting in spring 2019. A partial closure may eliminate the need relocate significant sections of Wellington Crescent, reduce riverbank stabilization costs, reduce traffic volumes and noise along the route, reduce tree removal, and provide enhanced cycling and pedestrian opportunities along the riverbank. Impacts to current and future road users, local residents, Assiniboine Park, and other users will need to be evaluated. Additional public engagement opportunities will occur after the traffic study is complete.
Share May 16, 2019 on Facebook
Share May 16, 2019 on Linkedin
Email May 16, 2019 link
A summary of the meeting held with adjacent property owners and stakeholders is now available.
The City reached out to adjacent property owners and stakeholders in spring 2019 to discuss the recommended design and gather feedback. An additional concept that would include a partial closure to Wellington Crescent for vehicles, which was identified at the stakeholder meeting and discussed at the adjacent property owner meeting in spring 2019, is currently being considered. Additional public engagement opportunities will occur after the traffic study is complete. Thank you to all who attended the property owners’ meeting and stakeholder meeting on April 25, 2019.
Key themes that were heard at the property owners’ meeting included:
Themes |
What We Heard |
Infrastructure |
- Strong preference to keep Wellington Crescent in its current location
- In favor of keeping the walk bike path in the wooded area
- Open to moving the walk bike path to the north side of Wellington Crescent near the Assiniboine Park east entrance
|
Property impacts (from Strategy 2)
|
- Potential for increased noise and pollution
- Potential privacy and security concerns
- Changes to property values
|
Traffic |
- Traffic volumes on Wellington Crescent are high
- Traffic speeds on Wellington Crescent are high
|
Riverbank protection |
- Proactive riverbank protection is important
- A "do nothing" approach is not favorable
|
Trees |
- Mature trees are strongly valued
- Trees contribute to neighbourhood character and should be protected if possible
|
Key themes that were heard at the stakeholder meeting with Bike Winnipeg and the Winnipeg Trails Association included:
Themes |
What We Heard |
Walk bike path |
- Current walk bike path is heavily used
- In favor of keeping the walk bike path in the wooded area and moving the path entirely to the north side of Wellington Crescent
|
Walk bike connectivity |
- Create connections to destinations south of the Assiniboine River
- Integration the walk bike path with the Route 90 Improvements Study
|
Wellington Crescent |
- Could Wellington Crescent be closed to vehicular traffic?
- Could Wellington Crescent be a one-way street?
|
Placemaking opportunities |
- Accommodate mountain bikers on the informal trails
- Potential for cross country ski trails and river access
|
Riverbank protection |
- Climate change needs to be considered
- The dynamic nature of rivers needs to be respected
|
For more information on what we heard, please view the property owners meeting summary and the stakeholder meeting summary.
Share April 26, 2019 on Facebook
Share April 26, 2019 on Linkedin
Email April 26, 2019 link
The City has completed the Functional Design and Options Assessment phase of the Wellington Crescent Riverbank, Path, and Roadway Project. A meeting was held with adjacent property owners to discuss the design and gather feedback. A summary of the meeting will be posted on the project website in May. Please view the timeline for next steps.