Wellington Crescent Riverbank, Path, and Roadway Project

Share Wellington Crescent Riverbank, Path, and Roadway Project on Facebook Share Wellington Crescent Riverbank, Path, and Roadway Project on Twitter Share Wellington Crescent Riverbank, Path, and Roadway Project on Linkedin Email Wellington Crescent Riverbank, Path, and Roadway Project link

Test Test Test

Introduction

The City of Winnipeg (the City) investigated how best to protect City infrastructure and preserve the south bank of the Assiniboine River on Wellington Crescent between Assiniboine Park and Doncaster Street. Stabilizing the bank is necessary to protect underground utilities and the nearby path and road from further riverbank failure.

Various options to manage riverbank related risks were evaluated to determine the best approach for protecting City assets and amenities.


Background

In the summer of 2016, cracks appeared in the walk bike path along Wellington Crescent near Lamont Boulevard. The City was monitoring the area and found that the cracking was caused by riverbank movement. The riverbank movement continued to worsen, and in July 2017 the riverbank failed. The walk bike path was closed for safety reasons and a temporary gravel detour was built along the north curb of Wellington Crescent. The riverbank monitoring also identified potential risks to the path and street at other locations within the project area.

In September 2018, the City began investigating solutions for the project area. The Wellington Crescent Riverbank, Path, and Roadway Project seeks to:

  • Protect the streets, paths, lighting and underground utilities from the impacts of ongoing erosion and movement by stabilizing the riverbank or relocating infrastructure out of high risk zones
  • Preserve the riverbank with erosion protection and stability improvements along the south bank of the Assiniboine River
  • Restore the damaged walk bike path or construct a new paved path in a different location along Wellington Crescent

Introduction

The City of Winnipeg (the City) investigated how best to protect City infrastructure and preserve the south bank of the Assiniboine River on Wellington Crescent between Assiniboine Park and Doncaster Street. Stabilizing the bank is necessary to protect underground utilities and the nearby path and road from further riverbank failure.

Various options to manage riverbank related risks were evaluated to determine the best approach for protecting City assets and amenities.


Background

In the summer of 2016, cracks appeared in the walk bike path along Wellington Crescent near Lamont Boulevard. The City was monitoring the area and found that the cracking was caused by riverbank movement. The riverbank movement continued to worsen, and in July 2017 the riverbank failed. The walk bike path was closed for safety reasons and a temporary gravel detour was built along the north curb of Wellington Crescent. The riverbank monitoring also identified potential risks to the path and street at other locations within the project area.

In September 2018, the City began investigating solutions for the project area. The Wellington Crescent Riverbank, Path, and Roadway Project seeks to:

  • Protect the streets, paths, lighting and underground utilities from the impacts of ongoing erosion and movement by stabilizing the riverbank or relocating infrastructure out of high risk zones
  • Preserve the riverbank with erosion protection and stability improvements along the south bank of the Assiniboine River
  • Restore the damaged walk bike path or construct a new paved path in a different location along Wellington Crescent
CLOSED: This poll has concluded. The poll was open from June 2, 2020 to July 19, 2020.
Share What aspects of the project interest you the most? on Facebook Share What aspects of the project interest you the most? on Twitter Share What aspects of the project interest you the most? on Linkedin Email What aspects of the project interest you the most? link

What aspects of the project interest you the most?

Path location
34%
Roadway location
9%
Roadway traffic
20%
Tree impacts
14%
Aquatic impacts
2%
Construction
2%
Riverbank stabilization
15%
Other
4%
Total Votes : 219