Airport Area West Water and Wastewater Study

Share Airport Area West Water and Wastewater Study on Facebook Share Airport Area West Water and Wastewater Study on Twitter Share Airport Area West Water and Wastewater Study on Linkedin Email Airport Area West Water and Wastewater Study link

Consultation has concluded

The purpose of this study is to develop a plan and cost estimate for regional water and sewer infrastructure for use in future planning in the area west of the airport. Information about the cost of water and sewer infrastructure will support the future decisions around growth and development of this unserviced area. 

The study area boundaries include the Rural Municipality (RM) of Rosser to the north, the Winnipeg James Armstrong Richardson International Airport to the east, Saskatchewan Avenue to the south, and the Perimeter Highway to the west.

The purpose of this study is to develop a plan and cost estimate for regional water and sewer infrastructure for use in future planning in the area west of the airport. Information about the cost of water and sewer infrastructure will support the future decisions around growth and development of this unserviced area. 

The study area boundaries include the Rural Municipality (RM) of Rosser to the north, the Winnipeg James Armstrong Richardson International Airport to the east, Saskatchewan Avenue to the south, and the Perimeter Highway to the west.

Consultation has concluded
  • Share What is the purpose of this study? on Facebook Share What is the purpose of this study? on Twitter Share What is the purpose of this study? on Linkedin Email What is the purpose of this study? link

    What is the purpose of this study?

    over 4 years ago

    The purpose of this study is to develop a Class 3 (-20% to + 30%) cost estimate for regional water and sewer infrastructure for use in future capital planning. The study involves preparing a plan for regional water and sewer servicing to support the future growth and development of the Airport Area West lands.

  • Share Where is the study area located? on Facebook Share Where is the study area located? on Twitter Share Where is the study area located? on Linkedin Email Where is the study area located? link

    Where is the study area located?

    over 4 years ago

    Study area boundaries include the Rural Municipality of Rosser to the north, the Winnipeg James Armstrong Richardson International Airport to the east, Saskatchewan Avenue to the south, and the Perimeter Highway to the west.

  • Share What types of development are anticipated to occur on the study area lands? on Facebook Share What types of development are anticipated to occur on the study area lands? on Twitter Share What types of development are anticipated to occur on the study area lands? on Linkedin Email What types of development are anticipated to occur on the study area lands? link

    What types of development are anticipated to occur on the study area lands?

    over 4 years ago

    The study area is anticipated to see a mix of industrial, commercial, and residential development. The lands south of CentrePort Canada Way and west of Sturgeon Access (approximately 650 acres) will potentially be developed as a residential neighbourhood. The remaining lands within the study area are expected to be developed for industrial use.

  • Share Who owns the study area lands? on Facebook Share Who owns the study area lands? on Twitter Share Who owns the study area lands? on Linkedin Email Who owns the study area lands? link

    Who owns the study area lands?

    over 4 years ago

    There are several public and private landowners within the study area.

  • Share When will the study area be serviced? on Facebook Share When will the study area be serviced? on Twitter Share When will the study area be serviced? on Linkedin Email When will the study area be serviced? link

    When will the study area be serviced?

    over 4 years ago

    The findings of this study will outline an estimated phased approach for the installation of regional water and wastewater infrastructure in the study area over the next 50 years. However, the estimated phasing may change due to fluctuations in market demand for future industrial, commercial, and residential development in the area.

  • Share How much will this project cost? on Facebook Share How much will this project cost? on Twitter Share How much will this project cost? on Linkedin Email How much will this project cost? link

    How much will this project cost?

    over 4 years ago

    A Class 5 (-50% to +100%) cost estimate of $70 million was developed as part of the Airport Area West Water and Wastewater Study. A Class 3 (-20% to + 30%) cost estimate will be available when the study wraps up in summer 2020.