Airport Area West Water and Wastewater Study
Consultation has concluded
The purpose of this study is to develop a plan and cost estimate for regional water and sewer infrastructure for use in future planning in the area west of the airport. Information about the cost of water and sewer infrastructure will support the future decisions around growth and development of this unserviced area.
The study area boundaries include the Rural Municipality (RM) of Rosser to the north, the Winnipeg James Armstrong Richardson International Airport to the east, Saskatchewan Avenue to the south, and the Perimeter Highway to the west.
The purpose of this study is to develop a plan and cost estimate for regional water and sewer infrastructure for use in future planning in the area west of the airport. Information about the cost of water and sewer infrastructure will support the future decisions around growth and development of this unserviced area.
The study area boundaries include the Rural Municipality (RM) of Rosser to the north, the Winnipeg James Armstrong Richardson International Airport to the east, Saskatchewan Avenue to the south, and the Perimeter Highway to the west.
-
Share What is the purpose of this study? on Facebook Share What is the purpose of this study? on Twitter Share What is the purpose of this study? on Linkedin Email What is the purpose of this study? link
What is the purpose of this study?
almost 4 years agoThe purpose of this study is to develop a Class 3 (-20% to + 30%) cost estimate for regional water and sewer infrastructure for use in future capital planning. The study involves preparing a plan for regional water and sewer servicing to support the future growth and development of the Airport Area West lands.
-
Share Where is the study area located? on Facebook Share Where is the study area located? on Twitter Share Where is the study area located? on Linkedin Email Where is the study area located? link
Where is the study area located?
almost 4 years agoStudy area boundaries include the Rural Municipality of Rosser to the north, the Winnipeg James Armstrong Richardson International Airport to the east, Saskatchewan Avenue to the south, and the Perimeter Highway to the west.
-
Share What types of development are anticipated to occur on the study area lands? on Facebook Share What types of development are anticipated to occur on the study area lands? on Twitter Share What types of development are anticipated to occur on the study area lands? on Linkedin Email What types of development are anticipated to occur on the study area lands? link
What types of development are anticipated to occur on the study area lands?
almost 4 years agoThe study area is anticipated to see a mix of industrial, commercial, and residential development. The lands south of CentrePort Canada Way and west of Sturgeon Access (approximately 650 acres) will potentially be developed as a residential neighbourhood. The remaining lands within the study area are expected to be developed for industrial use.
-
Share Who owns the study area lands? on Facebook Share Who owns the study area lands? on Twitter Share Who owns the study area lands? on Linkedin Email Who owns the study area lands? link
Who owns the study area lands?
almost 4 years agoThere are several public and private landowners within the study area.
-
Share When will the study area be serviced? on Facebook Share When will the study area be serviced? on Twitter Share When will the study area be serviced? on Linkedin Email When will the study area be serviced? link
When will the study area be serviced?
almost 4 years agoThe findings of this study will outline an estimated phased approach for the installation of regional water and wastewater infrastructure in the study area over the next 50 years. However, the estimated phasing may change due to fluctuations in market demand for future industrial, commercial, and residential development in the area.
-
Share How much will this project cost? on Facebook Share How much will this project cost? on Twitter Share How much will this project cost? on Linkedin Email How much will this project cost? link
How much will this project cost?
almost 4 years agoA Class 5 (-50% to +100%) cost estimate of $70 million was developed as part of the Airport Area West Water and Wastewater Study. A Class 3 (-20% to + 30%) cost estimate will be available when the study wraps up in summer 2020.
How can we help?
Visit winnipeg.ca/publicengagement to learn about some of the ways we can accommodate those who may need alternative access to engagement or information.
For inquiries or those who require alternate formats, interpretation or any additional accommodations to participate please contact winnipeg.ca/311 or 311.
Photos
Timeline
-
Projet begins
Airport Area West Water and Wastewater Study has finished this stageSummer 2019
-
Stakeholder meeting
Airport Area West Water and Wastewater Study has finished this stageAugust 2019
-
Data gathering and analysis
Airport Area West Water and Wastewater Study has finished this stageSummer - winter 2019
-
Stakeholder meeting
Airport Area West Water and Wastewater Study has finished this stageNovember 2019
-
Preliminary design
Airport Area West Water and Wastewater Study has finished this stageWinter 2019/20 - spring 2020
-
Preliminary design report
Airport Area West Water and Wastewater Study has finished this stageMay 2021
-
Detailed design and construction*
Airport Area West Water and Wastewater Study is currently at this stageTo be determined
*Subject to Council approval and funding
Document Library
- Preliminary Design Report - May 2021 (102 MB) (pdf)
- Preliminary Design Report Executive Summary - May 2021 (489 KB) (pdf)
- Project Study Area Map - August 2020 (203 KB) (pdf)
- Anticipated Land Use Map - August 2020 (220 KB) (pdf)
- Presentation Boards - August 2020 (6.81 MB) (pdf)
- Stakeholder Engagement Summary - September 2020 (85.1 KB) (pdf)
- Stakeholder Engagement Summary Appendices - September 2020 (21.8 MB) (pdf)
Type of Engagement
Inform
Get information or updates.