The purpose of this study is to develop a plan and cost estimate for regional water and sewer infrastructure for use in future planning in the area west of the airport. Information about the cost of water and sewer infrastructure will support the future decisions around growth and development of this unserviced area.
The study area boundaries include the Rural Municipality (RM) of Rosser to the north, the Winnipeg James Armstrong Richardson International Airport to the east, Saskatchewan Avenue to the south, and the Perimeter Highway to the west.
The purpose of this study is to develop a plan and cost estimate for regional water and sewer infrastructure for use in future planning in the area west of the airport. Information about the cost of water and sewer infrastructure will support the future decisions around growth and development of this unserviced area.
The study area boundaries include the Rural Municipality (RM) of Rosser to the north, the Winnipeg James Armstrong Richardson International Airport to the east, Saskatchewan Avenue to the south, and the Perimeter Highway to the west.
-
March 2, 2023
Share March 2, 2023 on Facebook Share March 2, 2023 on Twitter Share March 2, 2023 on Linkedin Email March 2, 2023 linkIn 2022 and 2023 respectively, the City of Winnipeg and the Province of Manitoba committed funding for regional water and wastewater infrastructure in CentrePort South (Airport Area West). On March 2, 2023 the RFP for the professional consulting services for CentrePort South (Airport Area West) Regional Water and Wastewater Servicing – Phase 1A Detailed Design and Contract Administration (RFP 122-2023) was released. It is scheduled to close at noon, Winnipeg time, on April 12, 2023.
Consultation has concludedIn 2022 and 2023 respectively, the City of Winnipeg and the Province of Manitoba committed funding for regional water and wastewater infrastructure in CentrePort South (Airport Area West). On March 2, 2023 the RFP for the professional consulting services for CentrePort South (Airport Area West) Regional Water and Wastewater Servicing – Phase 1A Detailed Design and Contract Administration (RFP 122-2023) was released. It is scheduled to close at noon, Winnipeg time, on April 12, 2023.
-
May 7, 2021
Share May 7, 2021 on Facebook Share May 7, 2021 on Twitter Share May 7, 2021 on Linkedin Email May 7, 2021 linkA Class 3 (-20% to +30%) cost estimate for regional water and sewer infrastructure has been developed. The cost estimate will used to inform future decisions regarding development and planning in the Airport Area West lands.
A preliminary design report and executive summary are now available that outlines the potential infrastructure, schedule, and costs. Please visit the Document Library to view the preliminary design report and executive summary.
Consultation has concludedA Class 3 (-20% to +30%) cost estimate for regional water and sewer infrastructure has been developed. The cost estimate will used to inform future decisions regarding development and planning in the Airport Area West lands.
A preliminary design report and executive summary are now available that outlines the potential infrastructure, schedule, and costs. Please visit the Document Library to view the preliminary design report and executive summary.
-
September 29, 2020
Share September 29, 2020 on Facebook Share September 29, 2020 on Twitter Share September 29, 2020 on Linkedin Email September 29, 2020 linkA stakeholder engagement summary is now available and provides an overview of the feedback collected for the project. Thank you to all who participated. Please visit the Document Library to view the stakeholder engagement summary.
A Class 3 (-20% to +30%) cost estimate will be developed before the project is complete in fall 2020. The preliminary design report executive summary will be available at the end of the project. The cost estimate will used to inform future decisions regarding development and planning in the Airport Area West lands.
Consultation has concludedA stakeholder engagement summary is now available and provides an overview of the feedback collected for the project. Thank you to all who participated. Please visit the Document Library to view the stakeholder engagement summary.
A Class 3 (-20% to +30%) cost estimate will be developed before the project is complete in fall 2020. The preliminary design report executive summary will be available at the end of the project. The cost estimate will used to inform future decisions regarding development and planning in the Airport Area West lands.
-
September 1, 2020
Share September 1, 2020 on Facebook Share September 1, 2020 on Twitter Share September 1, 2020 on Linkedin Email September 1, 2020 linkThank you to all those who completed a survey. Surveys were accepted until August 31, 2020. Feedback is currently being reviewed and a summary of the engagement process will be posted online.
Consultation has concludedThank you to all those who completed a survey. Surveys were accepted until August 31, 2020. Feedback is currently being reviewed and a summary of the engagement process will be posted online.
-
August 10, 2020
Share August 10, 2020 on Facebook Share August 10, 2020 on Twitter Share August 10, 2020 on Linkedin Email August 10, 2020 linkThe study team would like to share highlights from the draft Airport Area West Regional Water and Wastewater Servicing Study with key stakeholders and area landowners.
Our engagement goals for this project are to:
- Share study highlights with key stakeholders and landowners.
- Communicate how stakeholder input was used to help shape the Airport Area West Regional Water and Wastewater Servicing Study.
Please view the presentation boards and complete the online survey. The online survey will close August 31, 2020. The project is expected to wrap up in fall 2020.
Consultation has concludedThe study team would like to share highlights from the draft Airport Area West Regional Water and Wastewater Servicing Study with key stakeholders and area landowners.
Our engagement goals for this project are to:
- Share study highlights with key stakeholders and landowners.
- Communicate how stakeholder input was used to help shape the Airport Area West Regional Water and Wastewater Servicing Study.
Please view the presentation boards and complete the online survey. The online survey will close August 31, 2020. The project is expected to wrap up in fall 2020.
How can we help?
Visit winnipeg.ca/publicengagement to learn about some of the ways we can accommodate those who may need alternative access to engagement or information.
For inquiries or those who require alternate formats, interpretation or any additional accommodations to participate please contact winnipeg.ca/311 or 311.
Photos
Timeline
-
Projet begins
Airport Area West Water and Wastewater Study has finished this stageSummer 2019
-
Stakeholder meeting
Airport Area West Water and Wastewater Study has finished this stageAugust 2019
-
Data gathering and analysis
Airport Area West Water and Wastewater Study has finished this stageSummer - winter 2019
-
Stakeholder meeting
Airport Area West Water and Wastewater Study has finished this stageNovember 2019
-
Preliminary design
Airport Area West Water and Wastewater Study has finished this stageWinter 2019/20 - spring 2020
-
Preliminary design report
Airport Area West Water and Wastewater Study has finished this stageMay 2021
-
Detailed design and construction*
Airport Area West Water and Wastewater Study is currently at this stageTo be determined
*Subject to Council approval and funding
Document Library
-
Preliminary Design Report - May 2021 (102 MB) (pdf)
-
Preliminary Design Report Executive Summary - May 2021 (489 KB) (pdf)
-
Project Study Area Map - August 2020 (203 KB) (pdf)
-
Anticipated Land Use Map - August 2020 (220 KB) (pdf)
-
Presentation Boards - August 2020 (6.81 MB) (pdf)
-
Stakeholder Engagement Summary - September 2020 (85.1 KB) (pdf)
-
Stakeholder Engagement Summary Appendices - September 2020 (21.8 MB) (pdf)
Type of Engagement

Inform